Publication:
Cyclic scheduling in synchronous production lines

dc.contributor.coauthorKouvelis, P.
dc.contributor.departmentDepartment of Business Administration
dc.contributor.kuauthorKarabatı, Selçuk
dc.contributor.kuprofileFaculty Member
dc.contributor.otherDepartment of Business Administration
dc.contributor.schoolcollegeinstituteCollege of Administrative Sciences and Economics
dc.contributor.yokid38819
dc.date.accessioned2024-11-09T22:57:15Z
dc.date.issued1999
dc.description.abstractIn this paper we address the scheduling problem in unpaced synchronous mixed-model production lines operated under a cyclic scheduling policy. We first discuss operations of a production line with the synchronous transfer of parts. We then present an integer programming formulation of the problem. The problem, however, is NP-hard, and for its exact solution we propose an implicit enumeration scheme. We discuss a property of the scheduling problem which allows us to effectively solve large size instances of the problem. We also present an approximate solution procedure with very good average performance. Useful managerial insights are obtained as we search for ways to improve the performance of synchronous lines. The relaxation of one of our original assumptions in the scheduling problem formulation results in an easy problem whose solution generates the absolute best in throughput performance configuration of the production line. Implementation of this solution, however, requires increasing the number of buffers in the line. We suggest other performance improvement ways to better balance the tradeoff between throughput and average Work-In-Progress (WIP) inventory in the line.
dc.description.indexedbyWoS
dc.description.indexedbyScopus
dc.description.issue8
dc.description.openaccessNO
dc.description.publisherscopeInternational
dc.description.volume31
dc.identifier.doi10.1023/A:1007697926973
dc.identifier.issn0740-817X
dc.identifier.quartileQ1
dc.identifier.scopus2-s2.0-0033360348
dc.identifier.urihttp://dx.doi.org/10.1023/A:1007697926973
dc.identifier.urihttps://hdl.handle.net/20.500.14288/7521
dc.identifier.wos81559300002
dc.keywordsTime production systems
dc.keywordsModel assembly lines
dc.keywordsJob shops
dc.keywordsAlgorithm
dc.languageEnglish
dc.publisherTaylor & Francis
dc.sourceIIE Transactions
dc.subjectEngineering
dc.subjectIndustrial engineering
dc.subjectOperations research
dc.subjectManagement science
dc.titleCyclic scheduling in synchronous production lines
dc.typeJournal Article
dspace.entity.typePublication
local.contributor.authorid0000-0001-6976-5405
local.contributor.kuauthorKarabatı, Selçuk
relation.isOrgUnitOfPublicationca286af4-45fd-463c-a264-5b47d5caf520
relation.isOrgUnitOfPublication.latestForDiscoveryca286af4-45fd-463c-a264-5b47d5caf520

Files