Publication: An analytical formula for variance of output from a series-parallel production system with no interstation buffers and time-dependent failures
dc.contributor.department | Department of Business Administration | |
dc.contributor.department | Department of Business Administration | |
dc.contributor.kuauthor | Tan, Barış | |
dc.contributor.kuprofile | Faculty Member | |
dc.contributor.schoolcollegeinstitute | College of Administrative Sciences and Economics | |
dc.contributor.yokid | 28600 | |
dc.date.accessioned | 2024-11-09T23:28:40Z | |
dc.date.issued | 1998 | |
dc.description.abstract | This paper presents a method to determine the mean and the variance of the amount of materials produced in a fixed time interval by a continuous materials flow production system with N stations in series and M stations in parallel and no interstation buffers. Unreliable stations with exponential failure and repair times, time dependent failures, and deterministic processing times are considered. Closed-form expressions for the asymptotic mean and variance of the amount of materials produced per unit time are given for series, parallel, and series-parallel production systems with identical stations. It is shown that the distribution of the amount of materials produced in a fixed time is asymptotically normal. By using this property, effects of variability on the due-date performance are investigated by considering the probability of meeting a customer order on time. Numerical experiments that explore some relationships among performance measures and production system parameters are also presented. | |
dc.description.indexedby | WoS | |
dc.description.indexedby | Scopus | |
dc.description.issue | 6 | |
dc.description.openaccess | NO | |
dc.description.publisherscope | International | |
dc.description.sponsoredbyTubitakEu | N/A | |
dc.description.volume | 27 | |
dc.identifier.doi | 10.1016/S0895-7177(98)00031-4 | |
dc.identifier.issn | 0895-7177 | |
dc.identifier.quartile | Q1 | |
dc.identifier.scopus | 2-s2.0-0032031154 | |
dc.identifier.uri | http://dx.doi.org/10.1016/S0895-7177(98)00031-4 | |
dc.identifier.uri | https://hdl.handle.net/20.500.14288/11935 | |
dc.identifier.wos | 73196100009 | |
dc.keywords | Variance of the output | |
dc.keywords | Markov models | |
dc.keywords | Production systems | |
dc.keywords | Throughput | |
dc.keywords | Sojourn time | |
dc.keywords | Performance evaluation production lines | |
dc.keywords | Finite buffers | |
dc.keywords | Machines | |
dc.language | English | |
dc.publisher | Pergamon-Elsevier Science Ltd | |
dc.source | Mathematical and Computer Modelling | |
dc.subject | Computer science, interdisciplinary applications | |
dc.subject | Computer science, Software engineering | |
dc.subject | Mathematics, applied | |
dc.title | An analytical formula for variance of output from a series-parallel production system with no interstation buffers and time-dependent failures | |
dc.type | Journal Article | |
dspace.entity.type | Publication | |
local.contributor.authorid | 0000-0002-2584-1020 | |
local.contributor.kuauthor | Tan, Barış | |
relation.isOrgUnitOfPublication | ca286af4-45fd-463c-a264-5b47d5caf520 | |
relation.isOrgUnitOfPublication.latestForDiscovery | ca286af4-45fd-463c-a264-5b47d5caf520 |