Publication:
A multiperiod stochastic production planning and sourcing problem with service level constraints

dc.contributor.coauthorYıldırım, Işıl
dc.contributor.departmentDepartment of Business Administration
dc.contributor.departmentDepartment of Industrial Engineering
dc.contributor.kuauthorKaraesmen, Fikri
dc.contributor.kuauthorTan, Barış
dc.contributor.schoolcollegeinstituteCollege of Administrative Sciences and Economics
dc.contributor.schoolcollegeinstituteCollege of Engineering
dc.date.accessioned2024-11-09T12:29:04Z
dc.date.issued2005
dc.description.abstractWe study a stochastic multiperiod production planning and sourcing problem of a manufacturer with a number of plants and/or subcontractors. Each source, i.e. each plant and subcontractor, has a different production cost, capacity, and lead time. The manufacturer has to meet the demand for different products according to the service level requirements set by its customers. The demand for each product in each period is random. We present a methodology that a manufacturer can utilize to make its production and sourcing decisions, i.e., to decide how much to produce, when to produce, where to produce, how much inventory to carry, etc. This methodology is based on a mathematical programming approach. The randomness in demand and related probabilistic service level constraints are integrated in a deterministic mathematical program by adding a number of additional linear constraints. Using a rolling horizon approach that solves the deterministic equivalent problem based on the available data at each time period yields an approximate solution to the original dynamic problem. We show that this approach yields the same result as the base stock policy for a single plant with stationary demand. For a system with dual sources, we show that the results obtained from solving the deterministic equivalent model on a rolling horizon gives similar results to a threshold subcontracting policy.
dc.description.fulltextYES
dc.description.indexedbyWOS
dc.description.indexedbyScopus
dc.description.issue2&3
dc.description.openaccessYES
dc.description.publisherscopeInternational
dc.description.sponsoredbyTubitakEuN/A
dc.description.sponsorshipN/A
dc.description.versionAuthor's final manuscript
dc.description.volume27
dc.identifier.doi10.1007/s00291-005-0203-0
dc.identifier.eissn1436-6304
dc.identifier.embargoNO
dc.identifier.filenameinventorynoIR01101
dc.identifier.issn0171-6468
dc.identifier.quartileQ2
dc.identifier.scopus2-s2.0-17444395985
dc.identifier.urihttps://hdl.handle.net/20.500.14288/1839
dc.identifier.wos229688000014
dc.keywordsStochastic production planning
dc.keywordsService level constraints
dc.keywordsSubcontracting
dc.language.isoeng
dc.publisherSpringer
dc.relation.ispartofOR Spectrum
dc.relation.urihttp://cdm21054.contentdm.oclc.org/cdm/ref/collection/IR/id/1559
dc.subjectOperations research and management science
dc.titleA multiperiod stochastic production planning and sourcing problem with service level constraints
dc.typeJournal Article
dspace.entity.typePublication
local.contributor.kuauthorTan, Barış
local.contributor.kuauthorKaraesmen, Fikri
local.publication.orgunit1College of Administrative Sciences and Economics
local.publication.orgunit1College of Engineering
local.publication.orgunit2Department of Business Administration
local.publication.orgunit2Department of Industrial Engineering
relation.isOrgUnitOfPublicationca286af4-45fd-463c-a264-5b47d5caf520
relation.isOrgUnitOfPublicationd6d00f52-d22d-4653-99e7-863efcd47b4a
relation.isOrgUnitOfPublication.latestForDiscoveryca286af4-45fd-463c-a264-5b47d5caf520
relation.isParentOrgUnitOfPublication972aa199-81e2-499f-908e-6fa3deca434a
relation.isParentOrgUnitOfPublication8e756b23-2d4a-4ce8-b1b3-62c794a8c164
relation.isParentOrgUnitOfPublication.latestForDiscovery972aa199-81e2-499f-908e-6fa3deca434a

Files

Original bundle

Now showing 1 - 1 of 1
Thumbnail Image
Name:
1559.pdf
Size:
2.23 MB
Format:
Adobe Portable Document Format