Publication:
Reclaimer scheduling in dry bulk terminals

dc.contributor.departmentN/A
dc.contributor.kuauthorÜnsal, Özgür
dc.contributor.schoolcollegeinstituteGraduate School of Sciences and Engineering
dc.date.accessioned2024-11-09T11:49:49Z
dc.date.issued2020
dc.description.abstractThis paper studies a complex parallel scheduling problem with non-crossing constraint, sequence dependent setup times, eligibility restrictions, and precedence relationships motivated by reclaimer scheduling in dry bulk terminals. In a stockyard of any dry bulk terminal, stockpiles are handled by reclaimers. Therefore, improving the operational efficiency of reclaimers is critical for the overall performance of these terminals which are struggling with increasing workload. We study the variants of this problem with and without stacking operations. For each variant, we present a lower and an upper bound. A strong lower bound is obtained by relaxing the non-crossing constraint and solving the resulting problem to the optimality. While this relaxation still addresses a challenging scheduling problem, proposed arc-time-indexed formulation copes with the instances of practical size. We develop a novel constraint programming formulation to provide an upper bound for the problem. Computational experiments show this robust approach is able to generate near-optimal schedules for different stockyard configurations within a minute.
dc.description.fulltextYES
dc.description.indexedbyWoS
dc.description.indexedbyScopus
dc.description.openaccessYES
dc.description.publisherscopeInternational
dc.description.sponsoredbyTubitakEuTÜBİTAK
dc.description.sponsorshipScientific and Technological Research Council of Turkey (TÜBİTAK)
dc.description.versionPublisher version
dc.description.volume8
dc.formatpdf
dc.identifier.doi10.1109/ACCESS.2020.2997739
dc.identifier.embargoNO
dc.identifier.filenameinventorynoIR02292
dc.identifier.issn2169-3536
dc.identifier.linkhttps://doi.org/10.1109/ACCESS.2020.2997739
dc.identifier.quartileQ2
dc.identifier.scopus2-s2.0-85086586987
dc.identifier.urihttps://hdl.handle.net/20.500.14288/657
dc.identifier.wos541139500094
dc.keywordsBulk terminals
dc.keywordsMathematical programming
dc.keywordsParallel machines scheduling
dc.keywordsReclaimer scheduling
dc.languageEnglish
dc.publisherInstitute of Electrical and Electronics Engineers (IEEE)
dc.relation.grantno113M486
dc.relation.urihttp://cdm21054.contentdm.oclc.org/cdm/ref/collection/IR/id/8921
dc.sourceIEEE Access
dc.subjectComputer science
dc.subjectEngineering
dc.subjectTelecommunications
dc.titleReclaimer scheduling in dry bulk terminals
dc.typeJournal Article
dspace.entity.typePublication
local.contributor.kuauthorÜnsal, Özgür

Files

Original bundle

Now showing 1 - 1 of 1
Thumbnail Image
Name:
8921.pdf
Size:
944.34 KB
Format:
Adobe Portable Document Format