Publication:
Parallel machine scheduling with tool loading

dc.contributor.coauthorÖzpeynirci, Selin
dc.contributor.coauthorHnich, Brahim
dc.contributor.departmentDepartment of Economics
dc.contributor.facultymemberNo
dc.contributor.kuauthorGökgür, Burak
dc.contributor.schoolcollegeinstituteCollege of Administrative Sciences and Economics
dc.date.accessioned2024-11-09T22:52:40Z
dc.date.issued2016
dc.description.abstractThis paper presents a mixed integer programming approach that integrates the tool assignment and scheduling problems arising in parallel machine environments. There are a number of operations to be processed on parallel machines. Each operation requires a set of tools; however, the number of available tools are limited. Our objective is to minimize the makespan, i.e. the completion time of the final operation. We propose two different mathematical programming models for this problem. Since the problem is strongly NP hard in general, finding the optimal solution requires extremely long computational times as the problem size increases. We therefore develop a tabu search algorithm in order to find near-optimal solutions within reasonable times. (C) 2016 Elsevier Inc. All rights reserved.
dc.description.fulltextNo
dc.description.harvestedfromManual
dc.description.indexedbyWOS
dc.description.indexedbyScopus
dc.description.openaccessYES
dc.description.peerreviewstatusN/A
dc.description.publisherscopeInternational
dc.description.readpublishN/A
dc.description.sponsoredbyTubitakEuTÜBİTAK
dc.description.sponsorshipScientific and Technological Research Council of Turkey [110M492] This work is supported by The Scientific and Technological Research Council of Turkey, grant no: 110M492.
dc.description.sponsorshipTurkiye Bilimsel ve Teknolojik Arastirma Kurumu (TUBITAK)
dc.description.studentonlypublicationYes
dc.description.studentpublicationYes
dc.description.versionN/A
dc.identifier.WoSQuartileQ1
dc.identifier.doi10.1016/j.apm.2016.01.006
dc.identifier.eissn1872-8480
dc.identifier.embargoN/A
dc.identifier.endpage5671
dc.identifier.grantno110M492
dc.identifier.issn0307-904X
dc.identifier.issue9-10
dc.identifier.scopus2-s2.0-84957071455
dc.identifier.startpage5660
dc.identifier.urihttps://doi.org/10.1016/j.apm.2016.01.006
dc.identifier.urihttps://hdl.handle.net/20.500.14288/7066
dc.identifier.volume40
dc.identifier.wos000375511900033
dc.keywordsParallel machines
dc.keywordsScheduling
dc.keywordsTool assignment
dc.keywordsMixed integer programming
dc.keywordsTabu search
dc.language.isoeng
dc.publisherElsevier Science Inc
dc.relation.affiliationKoç University
dc.relation.collectionKoç University Institutional Repository
dc.relation.ispartofApplied Mathematical Modelling
dc.relation.openaccessN/A
dc.rightsN/A
dc.subjectEngineering
dc.subjectMathematics
dc.subjectMechanics
dc.titleParallel machine scheduling with tool loading
dc.typeJournal Article
dspace.entity.typePublication
local.contributor.kuauthorGökgür, Burak
relation.isOrgUnitOfPublication7ad2a3bb-d8d9-4cbd-a6a3-3ca4b30b40c3
relation.isOrgUnitOfPublication.latestForDiscovery7ad2a3bb-d8d9-4cbd-a6a3-3ca4b30b40c3
relation.isParentOrgUnitOfPublication972aa199-81e2-499f-908e-6fa3deca434a
relation.isParentOrgUnitOfPublication.latestForDiscovery972aa199-81e2-499f-908e-6fa3deca434a

Files