Publication: Parallel machine scheduling with tool loading
dc.contributor.coauthor | Özpeynirci, Selin | |
dc.contributor.coauthor | Hnich, Brahim | |
dc.contributor.department | N/A | |
dc.contributor.kuauthor | Gökgür, Burak | |
dc.contributor.kuprofile | PhD Student | |
dc.contributor.schoolcollegeinstitute | Graduate School of Business | |
dc.contributor.yokid | 181004 | |
dc.date.accessioned | 2024-11-09T22:52:40Z | |
dc.date.issued | 2016 | |
dc.description.abstract | This paper presents a mixed integer programming approach that integrates the tool assignment and scheduling problems arising in parallel machine environments. There are a number of operations to be processed on parallel machines. Each operation requires a set of tools; however, the number of available tools are limited. Our objective is to minimize the makespan, i.e. the completion time of the final operation. We propose two different mathematical programming models for this problem. Since the problem is strongly NP hard in general, finding the optimal solution requires extremely long computational times as the problem size increases. We therefore develop a tabu search algorithm in order to find near-optimal solutions within reasonable times. (C) 2016 Elsevier Inc. All rights reserved. | |
dc.description.indexedby | WoS | |
dc.description.indexedby | Scopus | |
dc.description.issue | 45208 | |
dc.description.openaccess | YES | |
dc.description.publisherscope | International | |
dc.description.sponsorship | Scientific and Technological Research Council of Turkey [110M492] This work is supported by The Scientific and Technological Research Council of Turkey, grant no: 110M492. | |
dc.description.volume | 40 | |
dc.identifier.doi | 10.1016/j.apm.2016.01.006 | |
dc.identifier.eissn | 1872-8480 | |
dc.identifier.issn | 0307-904X | |
dc.identifier.quartile | Q1 | |
dc.identifier.scopus | 2-s2.0-84957071455 | |
dc.identifier.uri | http://dx.doi.org/10.1016/j.apm.2016.01.006 | |
dc.identifier.uri | https://hdl.handle.net/20.500.14288/7066 | |
dc.identifier.wos | 375511900033 | |
dc.keywords | Parallel machines | |
dc.keywords | Scheduling | |
dc.keywords | Tool assignment | |
dc.keywords | Mixed integer programming | |
dc.keywords | Tabu search | |
dc.language | English | |
dc.publisher | Elsevier Science Inc | |
dc.source | Applied Mathematical Modelling | |
dc.subject | Engineering | |
dc.subject | Mathematics | |
dc.subject | Mechanics | |
dc.title | Parallel machine scheduling with tool loading | |
dc.type | Journal Article | |
dspace.entity.type | Publication | |
local.contributor.authorid | 0000-0001-7384-2856 | |
local.contributor.kuauthor | Gökgür, Burak |