Publication: Large-scale disassembly operations planning with parallel resources
| dc.contributor.department | Graduate School of Business | |
| dc.contributor.kuauthor | Gökgür, Burak | |
| dc.contributor.schoolcollegeinstitute | GRADUATE SCHOOL OF BUSINESS | |
| dc.date.accessioned | 2024-11-09T23:44:49Z | |
| dc.date.issued | 2015 | |
| dc.description.abstract | Disassembly systems obtain valuable parts from end-of-life products to remanufacture, reuse, or recycle them. This study deals with disassembly scheduling and presents a novel mixed integer programming model. Disassembly scheduling is the problem of determining quantity and schedule of items disassembled, held in inventory, sold, and disposed on capacitated resources over a planning horizon while satisfying at least a given service level. The model presented here includes a number of novelties including assignment of disassembly operations to parallel capacitated resources, consideration of costs to environment and demand for each level of items. We also present a problem testbed to be used for comparison of different algorithms and the generation mechanism. Results from a large experimental design using problem testbed are presented. | |
| dc.description.fulltext | No | |
| dc.description.harvestedfrom | Manual | |
| dc.description.indexedby | WOS | |
| dc.description.indexedby | Scopus | |
| dc.description.openaccess | NO | |
| dc.description.peerreviewstatus | N/A | |
| dc.description.publisherscope | International | |
| dc.description.readpublish | N/A | |
| dc.description.sponsoredbyTubitakEu | N/A | |
| dc.description.version | N/A | |
| dc.identifier.doi | 10.1007/s00170-015-7216-x | |
| dc.identifier.eissn | 1433-3015 | |
| dc.identifier.embargo | N/A | |
| dc.identifier.issn | 0268-3768 | |
| dc.identifier.quartile | Q2 | |
| dc.identifier.scopus | 2-s2.0-84929692866 | |
| dc.identifier.uri | https://doi.org/10.1007/s00170-015-7216-x | |
| dc.identifier.uri | https://hdl.handle.net/20.500.14288/13729 | |
| dc.identifier.wos | 363718600043 | |
| dc.keywords | Disassembly systems | |
| dc.keywords | Disassembly scheduling | |
| dc.keywords | Mathematical programming | |
| dc.keywords | Product | |
| dc.keywords | Parts | |
| dc.language.iso | eng | |
| dc.publisher | Springer | |
| dc.relation.affiliation | Koç University | |
| dc.relation.collection | Koç University Institutional Repository | |
| dc.relation.ispartof | International Journal of Advanced Manufacturing Technology | |
| dc.relation.openaccess | N/A | |
| dc.rights | N/A | |
| dc.subject | Automation | |
| dc.subject | Control systems | |
| dc.subject | Engineering | |
| dc.subject | Manufacturing engineering | |
| dc.title | Large-scale disassembly operations planning with parallel resources | |
| dc.type | Journal Article | |
| dspace.entity.type | Publication | |
| local.contributor.kuauthor | Gökgür, Burak | |
| relation.isGoalOfPublication | 268ca748-6034-4b36-86cc-7af63278f9cd | |
| relation.isGoalOfPublication.latestForDiscovery | 268ca748-6034-4b36-86cc-7af63278f9cd | |
| relation.isOrgUnitOfPublication | 66c315a1-2b3d-40d3-89e4-aab9ae3b313b | |
| relation.isOrgUnitOfPublication.latestForDiscovery | 66c315a1-2b3d-40d3-89e4-aab9ae3b313b | |
| relation.isParentOrgUnitOfPublication | eae8aa5b-4ed7-47c1-a210-5860cba53ef4 | |
| relation.isParentOrgUnitOfPublication.latestForDiscovery | eae8aa5b-4ed7-47c1-a210-5860cba53ef4 |
