Publication: Large-scale disassembly operations planning with parallel resources
dc.contributor.department | N/A | |
dc.contributor.kuauthor | Gökgür, Burak | |
dc.contributor.kuprofile | PhD Student | |
dc.contributor.schoolcollegeinstitute | Graduate School of Business | |
dc.contributor.yokid | 181004 | |
dc.date.accessioned | 2024-11-09T23:44:49Z | |
dc.date.issued | 2015 | |
dc.description.abstract | Disassembly systems obtain valuable parts from end-of-life products to remanufacture, reuse, or recycle them. This study deals with disassembly scheduling and presents a novel mixed integer programming model. Disassembly scheduling is the problem of determining quantity and schedule of items disassembled, held in inventory, sold, and disposed on capacitated resources over a planning horizon while satisfying at least a given service level. The model presented here includes a number of novelties including assignment of disassembly operations to parallel capacitated resources, consideration of costs to environment and demand for each level of items. We also present a problem testbed to be used for comparison of different algorithms and the generation mechanism. Results from a large experimental design using problem testbed are presented. | |
dc.description.indexedby | WoS | |
dc.description.indexedby | Scopus | |
dc.description.issue | 45143 | |
dc.description.openaccess | NO | |
dc.description.publisherscope | International | |
dc.description.volume | 81 | |
dc.identifier.doi | 10.1007/s00170-015-7216-x | |
dc.identifier.eissn | 1433-3015 | |
dc.identifier.issn | 0268-3768 | |
dc.identifier.quartile | Q2 | |
dc.identifier.scopus | 2-s2.0-84929692866 | |
dc.identifier.uri | http://dx.doi.org/10.1007/s00170-015-7216-x | |
dc.identifier.uri | https://hdl.handle.net/20.500.14288/13729 | |
dc.identifier.wos | 363718600043 | |
dc.keywords | Disassembly systems | |
dc.keywords | Disassembly scheduling | |
dc.keywords | Mathematical programming | |
dc.keywords | Product | |
dc.keywords | Parts | |
dc.language | English | |
dc.publisher | Springer | |
dc.source | International Journal of Advanced Manufacturing Technology | |
dc.subject | Automation | |
dc.subject | Control systems | |
dc.subject | Engineering | |
dc.subject | Manufacturing engineering | |
dc.title | Large-scale disassembly operations planning with parallel resources | |
dc.type | Journal Article | |
dspace.entity.type | Publication | |
local.contributor.authorid | 0000-0001-7384-2856 | |
local.contributor.kuauthor | Gökgür, Burak |