Publication:
Stockout risk estimation and expediting for repairable spare parts

dc.contributor.coauthorHekimoğlu, Mustafa
dc.contributor.coauthorŞahin, Mustafa
dc.contributor.departmentDepartment of Business Administration
dc.contributor.kuauthorKök, Abdullah Gürhan
dc.contributor.schoolcollegeinstituteCollege of Administrative Sciences and Economics
dc.date.accessioned2024-11-09T23:29:36Z
dc.date.issued2022
dc.description.abstractStockouts of repairable spares usually lead to significant downtime costs. Managers of Maintenance Repair Organizations (MROs) seek advance indicators of future stockouts which might allow them to take proactive actions that are beneficial for achieving target service levels with reasonable costs. Among such (proactive) actions, the most common, and the cheapest one is expediting existing repair processes. In this study, we develop an advance stockout risk estimation system for repairable spare parts. To the best of our knowledge, this is the first study to estimate the future stockout risk of a repairable part. The method considers different statistics, e.g. the number of ongoing repair processes, demand rate, repair time, etc. to estimate stockout risk of a repairable part for a given planning horizon. In our field tests with empirical data, the suggested method overperforms two heuristic approaches and achieves accuracy rates of 63% for 15 day-planning horizon and 83% for 45 days. We also suggest a repairable inventory control system including repair expediting, inspection and con-demnation processes. To optimize the control parameters we suggest a simple algorithm considering two constraints: Target service level and maximum fraction of expedited demand. The algorithm is proved to be efficient for finding the optimum policy parameter in our tests with empirical data. Tests with empirical data suggest savings up to 8%. Both systems are implemented at an MRO as building blocks of a inventory control tower. The impact of the implementation is assessed with empirical simulations and verified from the financial indicators of the company.
dc.description.indexedbyWOS
dc.description.indexedbyScopus
dc.description.openaccessNO
dc.description.publisherscopeInternational
dc.description.sponsoredbyTubitakEuN/A
dc.description.volume138
dc.identifier.doi10.1016/j.cor.2021.105562
dc.identifier.eissn1873-765X
dc.identifier.issn0305-0548
dc.identifier.quartileQ1
dc.identifier.scopus2-s2.0-85115948865
dc.identifier.urihttps://doi.org/10.1016/j.cor.2021.105562
dc.identifier.urihttps://hdl.handle.net/20.500.14288/12069
dc.identifier.wos703386200003
dc.keywordsRepairable spare parts
dc.keywordsInventory control
dc.keywordsStockout risk estimation
dc.keywordsRepair expediting
dc.language.isoeng
dc.publisherPergamon-Elsevier Science Ltd
dc.relation.ispartofComputers and Operations Research
dc.subjectComputer science
dc.subjectEngineering
dc.subjectIndustrial engineering
dc.subjectOperations research
dc.subjectManagement science
dc.titleStockout risk estimation and expediting for repairable spare parts
dc.typeJournal Article
dspace.entity.typePublication
local.contributor.kuauthorKök, Abdullah Gürhan
local.publication.orgunit1College of Administrative Sciences and Economics
local.publication.orgunit2Department of Business Administration
relation.isOrgUnitOfPublicationca286af4-45fd-463c-a264-5b47d5caf520
relation.isOrgUnitOfPublication.latestForDiscoveryca286af4-45fd-463c-a264-5b47d5caf520
relation.isParentOrgUnitOfPublication972aa199-81e2-499f-908e-6fa3deca434a
relation.isParentOrgUnitOfPublication.latestForDiscovery972aa199-81e2-499f-908e-6fa3deca434a

Files