Publication: Stochastic cyclic scheduling problem in synchronous assembly and production lines
dc.contributor.department | Department of Business Administration | |
dc.contributor.kuauthor | Tan, Barış | |
dc.contributor.kuauthor | Karabatı, Selçuk | |
dc.contributor.kuprofile | Faculty Member | |
dc.contributor.kuprofile | Faculty Member | |
dc.contributor.other | Department of Business Administration | |
dc.contributor.schoolcollegeinstitute | College of Administrative Sciences and Economics | |
dc.contributor.yokid | 28600 | |
dc.contributor.yokid | 38819 | |
dc.date.accessioned | 2024-11-09T12:39:04Z | |
dc.date.issued | 1998 | |
dc.description.abstract | In this paper we address the stochastic cyclic scheduling problem in synchronous assembly and production lines. Synchronous lines are widely used in the production and assembly of various goods such as automobiles or household appliances. We consider cycle time minimisation (or throughput rate maximisation) as the objective of the scheduling problem with the assumption that the processing times are independent random variables. We first discuss the two-station case and present a lower bounding scheme and an approximate solution procedure for the scheduling problem. For the general case of the problem, two heuristic solution procedures are presented. An extension of the two-station lower bound to the general case of the problem is also discussed. The performance of the proposed heuristics on randomly generated problems is documented, and the impact of scheduling decisions on problems with different levels of variability in processing times are analysed. We also analyse the problem of sequence determination when the available information is limited to the expected values of individual processing times. | |
dc.description.fulltext | YES | |
dc.description.indexedby | WoS | |
dc.description.indexedby | Scopus | |
dc.description.issue | 11 | |
dc.description.openaccess | YES | |
dc.description.publisherscope | International | |
dc.description.sponsoredbyTubitakEu | N/A | |
dc.description.sponsorship | N/A | |
dc.description.version | Author's final manuscript | |
dc.description.volume | 49 | |
dc.format | ||
dc.identifier.doi | 10.1057/palgrave.jors.2600625 | |
dc.identifier.eissn | 1476-9360 | |
dc.identifier.embargo | NO | |
dc.identifier.filenameinventoryno | IR01100 | |
dc.identifier.issn | 0160-5682 | |
dc.identifier.link | https://doi.org/10.1057/palgrave.jors.2600625 | |
dc.identifier.quartile | Q2 | |
dc.identifier.scopus | 2-s2.0-0032206271 | |
dc.identifier.uri | https://hdl.handle.net/20.500.14288/2044 | |
dc.identifier.wos | 76802900007 | |
dc.keywords | Cyclic scheduling | |
dc.keywords | Stochastic scheduling | |
dc.keywords | Synchronous flow lines | |
dc.language | English | |
dc.publisher | Taylor _ Francis | |
dc.relation.uri | http://cdm21054.contentdm.oclc.org/cdm/ref/collection/IR/id/1862 | |
dc.source | Journal of the Operational Research Society | |
dc.subject | Business and economics | |
dc.subject | Operations research and management science | |
dc.title | Stochastic cyclic scheduling problem in synchronous assembly and production lines | |
dc.type | Journal Article | |
dspace.entity.type | Publication | |
local.contributor.authorid | 0000-0002-2584-1020 | |
local.contributor.authorid | 0000-0001-6976-5405 | |
local.contributor.kuauthor | Tan, Barış | |
local.contributor.kuauthor | Karabatı, Selçuk | |
relation.isOrgUnitOfPublication | ca286af4-45fd-463c-a264-5b47d5caf520 | |
relation.isOrgUnitOfPublication.latestForDiscovery | ca286af4-45fd-463c-a264-5b47d5caf520 |
Files
Original bundle
1 - 1 of 1