Publication:
Stochastic cyclic scheduling problem in synchronous assembly and production lines

Thumbnail Image

School / College / Institute

Program

KU Authors

Co-Authors

Publication Date

Language

Embargo Status

NO

Journal Title

Journal ISSN

Volume Title

Alternative Title

Abstract

In this paper we address the stochastic cyclic scheduling problem in synchronous assembly and production lines. Synchronous lines are widely used in the production and assembly of various goods such as automobiles or household appliances. We consider cycle time minimisation (or throughput rate maximisation) as the objective of the scheduling problem with the assumption that the processing times are independent random variables. We first discuss the two-station case and present a lower bounding scheme and an approximate solution procedure for the scheduling problem. For the general case of the problem, two heuristic solution procedures are presented. An extension of the two-station lower bound to the general case of the problem is also discussed. The performance of the proposed heuristics on randomly generated problems is documented, and the impact of scheduling decisions on problems with different levels of variability in processing times are analysed. We also analyse the problem of sequence determination when the available information is limited to the expected values of individual processing times.

Source

Publisher

Taylor _ Francis

Subject

Business and economics, Operations research and management science

Citation

Has Part

Source

Journal of the Operational Research Society

Book Series Title

Edition

DOI

10.1057/palgrave.jors.2600625

item.page.datauri

Link

Rights

Copyrights Note

Endorsement

Review

Supplemented By

Referenced By

3

Views

4

Downloads

View PlumX Details