Publication:
Order acceptance and scheduling decisions in make-to-order systems

dc.contributor.coauthorYalçın, Zehra Bilgintuerk
dc.contributor.departmentDepartment of Industrial Engineering
dc.contributor.departmentDepartment of Industrial Engineering
dc.contributor.kuauthorOğuz, Ceyda
dc.contributor.kuauthorSalman, Fatma Sibel
dc.contributor.kuprofileFaculty Member
dc.contributor.kuprofileFaculty Member
dc.contributor.otherDepartment of Industrial Engineering
dc.contributor.schoolcollegeinstituteCollege of Engineering
dc.contributor.schoolcollegeinstituteCollege of Engineering
dc.contributor.yokid6033
dc.contributor.yokid178838
dc.date.accessioned2024-11-10T00:01:36Z
dc.date.issued2010
dc.description.abstractWe examine simultaneous order acceptance and scheduling decisions where the orders are defined by their release dates, due dates, deadlines, processing times, sequence dependent setup times and revenues in a single machine environment. The objective is to maximize total revenue, where the revenue from an order is a function of its tardiness and deadline. We give an MILP formulation which can be solved to optimality up to 15 orders. We develop three heuristic algorithms to solve large sized problems. Computational tests indicate that the proposed algorithms are both computationally efficient and effective even for instances up to 300 orders.
dc.description.indexedbyWoS
dc.description.indexedbyScopus
dc.description.issue1
dc.description.openaccessNO
dc.description.sponsorshipTUBITAK The work described in this paper was partially supported by a grant from TUBITAK for the third author.
dc.description.volume125
dc.identifier.doi10.1016/j.ijpe.2010.02.002
dc.identifier.issn0925-5273
dc.identifier.scopus2-s2.0-77949772409
dc.identifier.urihttp://dx.doi.org/10.1016/j.ijpe.2010.02.002
dc.identifier.urihttps://hdl.handle.net/20.500.14288/15991
dc.identifier.wos278148100019
dc.keywordsOrder acceptance
dc.keywordsSingle machine scheduling
dc.keywordsSequence dependent setup times
dc.keywordsHeuristics
dc.languageEnglish
dc.publisherElsevier Science Bv
dc.sourceInternational Journal Of Production Economics
dc.subjectEngineering
dc.subjectIndustrial engineering
dc.subjectManufacturing engineering
dc.subjectOperations research
dc.subjectManagement science
dc.titleOrder acceptance and scheduling decisions in make-to-order systems
dc.typeJournal Article
dspace.entity.typePublication
local.contributor.authorid0000-0003-0994-1758
local.contributor.authorid0000-0001-6833-2552
local.contributor.kuauthorOğuz, Ceyda
local.contributor.kuauthorSalman, Fatma Sibel
relation.isOrgUnitOfPublicationd6d00f52-d22d-4653-99e7-863efcd47b4a
relation.isOrgUnitOfPublication.latestForDiscoveryd6d00f52-d22d-4653-99e7-863efcd47b4a

Files