Publication: Effects of variability on the due-time performance of a continuous materials flow production system in series
| dc.contributor.department | Department of Business Administration | |
| dc.contributor.kuauthor | Faculty Member, Tan, Barış | |
| dc.contributor.schoolcollegeinstitute | College of Administrative Sciences and Economics | |
| dc.date.accessioned | 2024-11-09T23:37:22Z | |
| dc.date.issued | 1998 | |
| dc.description.abstract | In this study, we consider a specific continuous materials flow production system with N unreliable stations in series and no interstation buffers. Processing times of the stations are deterministic and Identical. We assume that the failures are time-dependent and the time to failure and time to repair distributions are exponential and two-phase balanced coxian (C-2:b), respectively. The effects of repair time variability on the performance of the production system are investigated by changing the parameters of C,, distribution. We obtained closed-form expressions for the asymptotic mean and variance of the amount of materials produced in this production system. It is shown that the amount of materials produced in a fixed time interval is normal as time approaches infinity. The asymptotic distribution of the amount of materials produced is used to derive the probability of meeting a customer order on time. We used this probability to evaluate the due-time performance of the production system. Numerical experiments that investigate some relationships among the performance measures and the system parameters are also presented. | |
| dc.description.indexedby | WOS | |
| dc.description.indexedby | Scopus | |
| dc.description.issue | 1 | |
| dc.description.openaccess | NO | |
| dc.description.publisherscope | International | |
| dc.description.sponsoredbyTubitakEu | N/A | |
| dc.description.volume | 54 | |
| dc.identifier.doi | 10.1016/S0925-5273(97)00132-1 | |
| dc.identifier.eissn | 1873-7579 | |
| dc.identifier.issn | 0925-5273 | |
| dc.identifier.quartile | Q1 | |
| dc.identifier.scopus | 2-s2.0-0032484451 | |
| dc.identifier.uri | https://doi.org/10.1016/S0925-5273(97)00132-1 | |
| dc.identifier.uri | https://hdl.handle.net/20.500.14288/12811 | |
| dc.identifier.wos | 71713100007 | |
| dc.keywords | Continuous materials flow production systems | |
| dc.keywords | Availability analysis | |
| dc.keywords | Variability reduction | |
| dc.keywords | Throughput analysis | |
| dc.keywords | Performance evaluation | |
| dc.keywords | Due-time performance output processes | |
| dc.keywords | Production lines | |
| dc.keywords | Finite buffers | |
| dc.keywords | Machines | |
| dc.language.iso | eng | |
| dc.publisher | Elsevier Science Bv | |
| dc.relation.ispartof | International Journal of Production Economics | |
| dc.subject | Engineering, industrial | |
| dc.subject | Engineering, manufacturing | |
| dc.subject | Operations research and management science | |
| dc.title | Effects of variability on the due-time performance of a continuous materials flow production system in series | |
| dc.type | Journal Article | |
| dspace.entity.type | Publication | |
| local.contributor.kuauthor | Tan, Barış | |
| local.publication.orgunit1 | College of Administrative Sciences and Economics | |
| local.publication.orgunit2 | Department of Business Administration | |
| relation.isOrgUnitOfPublication | ca286af4-45fd-463c-a264-5b47d5caf520 | |
| relation.isOrgUnitOfPublication.latestForDiscovery | ca286af4-45fd-463c-a264-5b47d5caf520 | |
| relation.isParentOrgUnitOfPublication | 972aa199-81e2-499f-908e-6fa3deca434a | |
| relation.isParentOrgUnitOfPublication.latestForDiscovery | 972aa199-81e2-499f-908e-6fa3deca434a |
