Publication:
Effects of variability on the due-time performance of a continuous materials flow production system in series

dc.contributor.departmentDepartment of Business Administration
dc.contributor.kuauthorTan, Barış
dc.contributor.schoolcollegeinstituteCollege of Administrative Sciences and Economics
dc.date.accessioned2024-11-09T23:37:22Z
dc.date.issued1998
dc.description.abstractIn this study, we consider a specific continuous materials flow production system with N unreliable stations in series and no interstation buffers. Processing times of the stations are deterministic and Identical. We assume that the failures are time-dependent and the time to failure and time to repair distributions are exponential and two-phase balanced coxian (C-2:b), respectively. The effects of repair time variability on the performance of the production system are investigated by changing the parameters of C,, distribution. We obtained closed-form expressions for the asymptotic mean and variance of the amount of materials produced in this production system. It is shown that the amount of materials produced in a fixed time interval is normal as time approaches infinity. The asymptotic distribution of the amount of materials produced is used to derive the probability of meeting a customer order on time. We used this probability to evaluate the due-time performance of the production system. Numerical experiments that investigate some relationships among the performance measures and the system parameters are also presented.
dc.description.indexedbyWOS
dc.description.indexedbyScopus
dc.description.issue1
dc.description.openaccessNO
dc.description.publisherscopeInternational
dc.description.sponsoredbyTubitakEuN/A
dc.description.volume54
dc.identifier.doi10.1016/S0925-5273(97)00132-1
dc.identifier.eissn1873-7579
dc.identifier.issn0925-5273
dc.identifier.quartileQ1
dc.identifier.scopus2-s2.0-0032484451
dc.identifier.urihttps://doi.org/10.1016/S0925-5273(97)00132-1
dc.identifier.urihttps://hdl.handle.net/20.500.14288/12811
dc.identifier.wos71713100007
dc.keywordsContinuous materials flow production systems
dc.keywordsAvailability analysis
dc.keywordsVariability reduction
dc.keywordsThroughput analysis
dc.keywordsPerformance evaluation
dc.keywordsDue-time performance output processes
dc.keywordsProduction lines
dc.keywordsFinite buffers
dc.keywordsMachines
dc.language.isoeng
dc.publisherElsevier Science Bv
dc.relation.ispartofInternational Journal of Production Economics
dc.subjectEngineering, industrial
dc.subjectEngineering, manufacturing
dc.subjectOperations research and management science
dc.titleEffects of variability on the due-time performance of a continuous materials flow production system in series
dc.typeJournal Article
dspace.entity.typePublication
local.contributor.kuauthorTan, Barış
local.publication.orgunit1College of Administrative Sciences and Economics
local.publication.orgunit2Department of Business Administration
relation.isOrgUnitOfPublicationca286af4-45fd-463c-a264-5b47d5caf520
relation.isOrgUnitOfPublication.latestForDiscoveryca286af4-45fd-463c-a264-5b47d5caf520
relation.isParentOrgUnitOfPublication972aa199-81e2-499f-908e-6fa3deca434a
relation.isParentOrgUnitOfPublication.latestForDiscovery972aa199-81e2-499f-908e-6fa3deca434a

Files