Publication: Effects of variability on the due-time performance of a continuous materials flow production system in series
Loading...
Program
KU-Authors
Organization Authors
Co-Authors
Date
Language
Type
Embargo Status
N/A
Journal Title
Journal ISSN
Volume Title
Alternative Title
Abstract
In this study, we consider a specific continuous materials flow production system with N unreliable stations in series and no interstation buffers. Processing times of the stations are deterministic and Identical. We assume that the failures are time-dependent and the time to failure and time to repair distributions are exponential and two-phase balanced coxian (C-2:b), respectively. The effects of repair time variability on the performance of the production system are investigated by changing the parameters of C,, distribution. We obtained closed-form expressions for the asymptotic mean and variance of the amount of materials produced in this production system. It is shown that the amount of materials produced in a fixed time interval is normal as time approaches infinity. The asymptotic distribution of the amount of materials produced is used to derive the probability of meeting a customer order on time. We used this probability to evaluate the due-time performance of the production system. Numerical experiments that investigate some relationships among the performance measures and the system parameters are also presented.
Source
Publisher
Elsevier
Citation
item.page.haspartof
Source
International Journal of Production Economics
item.page.ispartofseries
item.page.edition
DOI
10.1016/S0925-5273(97)00132-1
item.page.datauri
item.page.link
Rights
N/A
Copyrights Note
Rights and licensing
N/A
