Publication:
Variance of the output as a function of time: production line dynamics

dc.contributor.departmentDepartment of Business Administration
dc.contributor.facultymemberYes
dc.contributor.kuauthorTan, Barış
dc.contributor.schoolcollegeinstituteCollege of Administrative Sciences and Economics
dc.date.accessioned2024-11-09T23:49:12Z
dc.date.issued1999
dc.description.abstractWe consider Markovian models of discrete materials flow production systems. The transient behavior of a production line is investigated. Namely, mean and variance of the number of parts produced in a given time period conditioned on an arbitrary initial condition is determined by using a Markov reward model. Closed-form expression for the variance of the output from a single unreliable station is derived to illustrate the procedure. Then variance of the output from a general two-station production line with a finite buffer is determined by using a set of recursive equations that exploits the special structure of the probability matrix. The relationship between the due-time performance and variability of the line is investigated by determining the probability of meeting a customer order on time and also the time to produce a given order approximately. Numerical experiments that investigate the relationships between the system parameters and production line dynamics are also included.
dc.description.fulltextNo
dc.description.harvestedfromManual
dc.description.indexedbyWOS
dc.description.indexedbyScopus
dc.description.openaccessNO
dc.description.peerreviewstatusN/A
dc.description.publisherscopeInternational
dc.description.readpublishN/A
dc.description.sponsoredbyTubitakEuN/A
dc.description.studentonlypublicationNo
dc.description.studentpublicationNo
dc.description.versionN/A
dc.identifier.doi10.1016/S0377-2217(98)00266-5
dc.identifier.embargoN/A
dc.identifier.endpage484
dc.identifier.issn0377-2217
dc.identifier.issue3
dc.identifier.quartileQ1
dc.identifier.scopus2-s2.0-0032683951
dc.identifier.startpage470
dc.identifier.urihttps://doi.org/10.1016/S0377-2217(98)00266-5
dc.identifier.urihttps://hdl.handle.net/20.500.14288/14335
dc.identifier.volume117
dc.identifier.wos000082109300004
dc.keywordsProduction lines
dc.keywordsMarkov models of manufacturing systems
dc.keywordsOutput variability
dc.keywordsFinite buffer tandem queues
dc.language.isoeng
dc.publisherElsevier Science Bv
dc.relation.affiliationKoç University
dc.relation.collectionKoç University Institutional Repository
dc.relation.ispartofEuropean Journal of Operational Research
dc.relation.openaccessN/A
dc.rightsN/A
dc.subjectManagement
dc.subjectOperations research
dc.subjectManagement science
dc.titleVariance of the output as a function of time: production line dynamics
dc.typeJournal Article
dspace.entity.typePublication
local.contributor.kuauthorTan, Barış
relation.isOrgUnitOfPublicationca286af4-45fd-463c-a264-5b47d5caf520
relation.isOrgUnitOfPublication.latestForDiscoveryca286af4-45fd-463c-a264-5b47d5caf520
relation.isParentOrgUnitOfPublication972aa199-81e2-499f-908e-6fa3deca434a
relation.isParentOrgUnitOfPublication.latestForDiscovery972aa199-81e2-499f-908e-6fa3deca434a

Files