Publication:
Modelling and scheduling of an asynchronous cyclic production line with multiple parts

dc.contributor.departmentDepartment of Business Administration
dc.contributor.kuauthorKarabatı, Selçuk
dc.contributor.kuauthorTan, Barış
dc.contributor.schoolcollegeinstituteCollege of Administrative Sciences and Economics
dc.date.accessioned2024-11-09T11:48:27Z
dc.date.issued2000
dc.description.abstractIn this study, we model and analyse a production line with asynchronous part transfers, processing time variability, and cyclic scheduling in the same framework. We consider a production line with multiple parts and finite interstation buffers. The line produces a batch of n jobs repetitively using the same order of jobs in every batch. The processing time of a job on a station is a random variable and is assumed to have a phase-type distribution. Parts are transferred between the stations in an asynchronous manner. We first present a continuous time Markov chain model to analyse the performance of this system for a given sequence. A state-space representation of the model and the associated rate matrix are generated automatically. The steady state probabilities of the Markov chain are determined by using a recursive method that exploits the special structure of the rate matrix. The cycle time, the production rate, and the expected Work-In-Progress (WIP) inventory are used as the main performance measures. We then present an approximate procedure to determine the cyclic sequence that minimises the cycle time. We then investigate the effects of operating decisions, system structure, processing time variability, and their interaction in the same framework. Numerical results for the performance evaluation and scheduling of cyclic production lines are also presented.
dc.description.fulltextYES
dc.description.indexedbyWOS
dc.description.indexedbyScopus
dc.description.issue11
dc.description.openaccessYES
dc.description.publisherscopeInternational
dc.description.sponsoredbyTubitakEuN/A
dc.description.sponsorshipN/A
dc.description.versionAuthor's final manuscript
dc.description.volume51
dc.identifier.doi10.1057/palgrave.jors.2601020
dc.identifier.eissn1476-9360
dc.identifier.embargoNO
dc.identifier.filenameinventorynoIR01083
dc.identifier.issn0160-5682
dc.identifier.quartileQ2
dc.identifier.scopus2-s2.0-0034323738
dc.identifier.urihttps://hdl.handle.net/20.500.14288/609
dc.identifier.wos165198500009
dc.keywordsCyclic scheduling
dc.keywordsStochastic scheduling
dc.keywordsAsynchronous production lines
dc.keywordsMarkov chain
dc.keywordsManufacturing systems
dc.language.isoeng
dc.publisherPalgrave Macmillan
dc.relation.ispartofJournal of the Operational Research Society
dc.relation.urihttp://cdm21054.contentdm.oclc.org/cdm/ref/collection/IR/id/1510
dc.subjectBusiness and economics
dc.subjectOperations research and management science
dc.titleModelling and scheduling of an asynchronous cyclic production line with multiple parts
dc.typeJournal Article
dspace.entity.typePublication
local.contributor.kuauthorTan, Barış
local.contributor.kuauthorKarabatı, Selçuk
local.publication.orgunit1College of Administrative Sciences and Economics
local.publication.orgunit2Department of Business Administration
relation.isOrgUnitOfPublicationca286af4-45fd-463c-a264-5b47d5caf520
relation.isOrgUnitOfPublication.latestForDiscoveryca286af4-45fd-463c-a264-5b47d5caf520
relation.isParentOrgUnitOfPublication972aa199-81e2-499f-908e-6fa3deca434a
relation.isParentOrgUnitOfPublication.latestForDiscovery972aa199-81e2-499f-908e-6fa3deca434a

Files

Original bundle

Now showing 1 - 1 of 1
Thumbnail Image
Name:
1510.pdf
Size:
337.12 KB
Format:
Adobe Portable Document Format