<link rel="stylesheet" href="styles.f3b1fba60ec7970c.css">

Publication:
Parallel machine scheduling with flexible resources

Loading...
Thumbnail Image

Departments

Item type:Organizational Unit,

School / College / Institute

Item type:Organizational Unit,

Program

KU-Authors

Organization Authors

Co-Authors

Edis, Emrah B.

Date

Language

Embargo Status

N/A

Journal Title

Journal ISSN

Volume Title

Alternative Title

Abstract

Parallel machine flexible resource scheduling (PMFRS) problems consider an additional flexible resource (e.g. operators), which can be freely allocated to any jobs and/or any machines and may speed-up the process in proportion to its amount. If job-machine assignment is unspecified, the problem is referred to as unspecified PMFRS (UPMFRS). This paper reviews the mathematical models of both PMFRS and UPMFRS problems in the literature and not only gives some extensions to the model of dynamic PMFRS problem but also presents integer programming (IP) models for static and dynamic UPMFRS problems with the objective of minimizing makespan. To solve large-sized dynamic PMFRS and UPMFRS problems, a relaxed IP based constraint programming (CP) approach is also proposed. All IP models and the proposed IP/CP approach are tested with an extensive computational study. The results of the computational experiments are discussed with respect to the major parameters of the problem and conclusions are drawn.

Source

Publisher

Elsevier

Citation

item.page.haspartof

Source

Computers and Industrial Engineering

item.page.ispartofseries

item.page.edition

DOI

10.1016/j.cie.2012.03.018

item.page.datauri

item.page.link

Rights

N/A

Copyrights Note

Rights and licensing

N/A

Endorsement

Review

Supplemented By

Referenced By

Related Patent

Related Goal

Google Scholar
Scholar'da Ara ↗
Altmetric
Dimensions
PlumX Metrikleri
BIP! Indicators