Publication:
Solution approaches for simultaneous scheduling of jobs and operators on parallel machines

dc.contributor.coauthorEdis, Emrah B.
dc.contributor.coauthorÖzkarahan, Irem
dc.contributor.departmentDepartment of Industrial Engineering
dc.contributor.kuauthorOğuz, Ceyda
dc.contributor.kuprofileFaculty Member
dc.contributor.otherDepartment of Industrial Engineering
dc.contributor.schoolcollegeinstituteCollege of Engineering
dc.contributor.yokid6033
dc.date.accessioned2024-11-10T00:08:41Z
dc.date.issued2012
dc.description.abstractProduction scheduling and machine maintenance are two inseparable operational issues in multistage production systems. Previous studies attempted to deal with this issue by simplifying this problem due to the degradation uncertainties of the machines, ignoring the substantial interactions between these two tasks and leading to less efficiency of the entire production system. In this study, we fill the gap and formulate the joint optimization problem with more emphasis on the interaction between job scheduling and maintenance for a series-parallel multistage production system. Specifically, a mixed-effect degradation model is proposed to leverage the underlying interaction between job scheduling and machine maintenance. To efficiently solve this joint problem, several properties from this formulation have been derived. A two-phase method considering condition-based information, with a proactive algorithm for local intensification and a condition-based workload reallocation strategy & maintenance strategy, is then developed to address the uncertainties from the machine degradation status. A numerical study is finally borrowed to demonstrate the higher production efficiency achieved by applying the proposed method, compared with other benchmarks. —This study is motivated by a practical scenario where both job allocation and maintenance need to be determined simultaneously in the multistage production system by the operators to achieve time and cost efficiency. We focus on developing a new scheme that job scheduling and machine maintenance are able to be conducted simultaneously. Two issues are noteworthy to better implement this scheme. First, for characterizing the interaction between scheduling and maintenance, the data collected in real-time can provide a sufficient basis for the degradation path, and the production parameters can be acquired from real practice. Second, this scheme can be offered to help decision-making by a two-phase solution framework given the condition-based information during the production process. Specifically, an appropriate job allocation planning can be obtained offline in the first phase of the proposed two-phase solution framework under a limited computing resource. Meanwhile, a condition-based adjustment strategy in the second phase can update the solution based on the in-situ condition information collected from the data platform to achieve higher production efficiency.
dc.description.indexedbyWoS
dc.description.indexedbyScopus
dc.description.issue3
dc.description.openaccessYES
dc.description.publisherscopeInternational
dc.description.volume27
dc.identifier.doiN/A
dc.identifier.issn1300-1884
dc.identifier.linkhttps://www.scopus.com/inward/record.uri?eid=2-s2.0-84867033266andpartnerID=40andmd5=44d1ed4331678c8ce697f4e5348a55c0
dc.identifier.quartileQ3
dc.identifier.uriN/A
dc.identifier.urihttps://hdl.handle.net/20.500.14288/16981
dc.identifier.wos309469800008
dc.keywordsConstraint programming
dc.keywordsInteger programming
dc.keywordsJob and operator scheduling
dc.keywordsParallel machines
dc.keywordsCompletion time
dc.keywordsConstraint programming
dc.keywordsConstraint programming model
dc.keywordsCross training
dc.keywordsManufacturing environments
dc.keywordsOne-machine
dc.keywordsParallel machine
dc.keywordsParallel machine-scheduling problems
dc.keywordsProcessing resources
dc.keywordsReal-life problems
dc.keywordsScheduling problem
dc.keywordsSimultaneous scheduling
dc.keywordsSolution approach
dc.keywordsTest problem
dc.keywordsTime-periods
dc.keywordsComputer programming
dc.keywordsConstraint theory
dc.keywordsInteger programming
dc.keywordsMachinery
dc.keywordsUnloading
dc.keywordsScheduling
dc.languageTurkish
dc.publisherGazi Üniversitesi
dc.sourceJournal of the Faculty of Engineering and Architecture of Gazi University
dc.subjectIndustrial engineering
dc.titleSolution approaches for simultaneous scheduling of jobs and operators on parallel machines
dc.title.alternativeParalel makinelerde işlerin ve makine operatörlerinin birlikte çizelgelenmesi problemine çözüm yaklaşımları
dc.typeJournal Article
dspace.entity.typePublication
local.contributor.authorid0000-0003-0994-1758
local.contributor.kuauthorOğuz, Ceyda
relation.isOrgUnitOfPublicationd6d00f52-d22d-4653-99e7-863efcd47b4a
relation.isOrgUnitOfPublication.latestForDiscoveryd6d00f52-d22d-4653-99e7-863efcd47b4a

Files