Publication:
Assembly line balancing in a mixed-model sequencing environment with synchronous transfers

dc.conference.dateAPR 17-19, 2000
dc.conference.locationOsnabruck, Germany
dc.conference.organizer7th International Workshop on Project Managment and Scheduling
dc.contributor.coauthorN/A
dc.contributor.departmentDepartment of Business Administration
dc.contributor.facultymemberYes
dc.contributor.kuauthorKarabatı, Selçuk
dc.contributor.kuauthorSayın, Serpil
dc.contributor.schoolcollegeinstituteCollege of Administrative Sciences and Economics
dc.date.accessioned2024-11-09T22:58:18Z
dc.date.issued2003
dc.description.abstractWe consider the assembly line balancing problem in a mixed-model line which is operated under a cyclic sequencing approach. We specifically study the problem in an assembly line environment with synchronous transfer of parts between the stations. We formulate the assembly line balancing problem with the objective of minimizing total cycle time by incorporating the cyclic sequencing information. We show that the solution of a mathematical model that combines multiple models into a single one by adding up operation times constitutes a lower bound for this formulation. As an approximate solution to the original problem, we propose an alternative formulation that suggests to minimize the maximum subcycle time. We also develop a simple heuristic approach for this alternative problem. We provide computational results that compare the various approaches we discuss.
dc.description.fulltextNo
dc.description.harvestedfromManual
dc.description.indexedbyWOS
dc.description.indexedbyScopus
dc.description.openaccessNO
dc.description.peerreviewstatusN/A
dc.description.publisherscopeInternational
dc.description.readpublishN/A
dc.description.sponsoredbyTubitakEuN/A
dc.description.studentonlypublicationNo
dc.description.studentpublicationNo
dc.description.versionN/A
dc.identifier.WoSQuartileQ1
dc.identifier.doi10.1016/S0377-2217(02)00764-6
dc.identifier.embargoN/A
dc.identifier.endpage429
dc.identifier.issn0377-2217
dc.identifier.issue2
dc.identifier.scopus2-s2.0-0037508541
dc.identifier.startpage417
dc.identifier.urihttps://doi.org/10.1016/S0377-2217(02)00764-6
dc.identifier.urihttps://hdl.handle.net/20.500.14288/7685
dc.identifier.volume149
dc.identifier.wos000183306500013
dc.keywordsMixed-model assembly lines
dc.keywordsCyclic scheduling
dc.keywordsAssembly line balancing
dc.language.isoeng
dc.publisherElsevier
dc.relation.affiliationKoç University
dc.relation.collectionKoç University Institutional Repository
dc.relation.ispartofEuropean Journal of Operational Research
dc.relation.openaccessN/A
dc.rightsN/A
dc.subjectManagement
dc.subjectOperations research
dc.subjectManagement science
dc.titleAssembly line balancing in a mixed-model sequencing environment with synchronous transfers
dc.typeConference Proceeding
dspace.entity.typePublication
local.contributor.kuauthorKarabatı, Selçuk
local.contributor.kuauthorSayın, Serpil
relation.isOrgUnitOfPublicationca286af4-45fd-463c-a264-5b47d5caf520
relation.isOrgUnitOfPublication.latestForDiscoveryca286af4-45fd-463c-a264-5b47d5caf520
relation.isParentOrgUnitOfPublication972aa199-81e2-499f-908e-6fa3deca434a
relation.isParentOrgUnitOfPublication.latestForDiscovery972aa199-81e2-499f-908e-6fa3deca434a

Files