Publication: Production control of a pull system with production and demand uncertainty
Loading...
Files
Program
KU-Authors
Organization Authors
Co-Authors
Date
Language
Type
Embargo Status
NO
Journal Title
Journal ISSN
Volume Title
Alternative Title
Abstract
We consider a continuous material-flow manufacturing system with an unreliable production system and a variable demand source which switches randomly between zero and a maximum level. The failure and repair times of the production system and the switching times of the demand source are assumed to be exponentially distributed random variables. The optimal production flow control policy that minimizes the expected average inventory carrying and backlog costs is characterized as a double-hedging policy. The optimal hedging levels are determined analytically by minimizing the closed-form expression of the cost function. We investigate two approximate single hedging policies. It is empirically shown that an approximate policy that uses a single hedging level which is the sum of a production uncertainty term and a demand uncertainty term gives accurate results for the expected average cost.
Source
Publisher
Institute of Electrical and Electronics Engineers (IEEE)
Subject
Citation
item.page.haspartof
Source
IEEE Transactions on Automatic Control
item.page.ispartofseries
item.page.edition
DOI
10.1109/TAC.2002.1000272
