Publication:
Constraint programming approach to quay crane scheduling problem

dc.contributor.coauthorN/A
dc.contributor.departmentN/A
dc.contributor.departmentDepartment of Industrial Engineering
dc.contributor.kuauthorÜnsal, Özgür
dc.contributor.kuauthorOğuz, Ceyda
dc.contributor.kuprofilePhD Student
dc.contributor.kuprofileFaculty Member
dc.contributor.otherDepartment of Industrial Engineering
dc.contributor.schoolcollegeinstituteGraduate School of Sciences and Engineering
dc.contributor.schoolcollegeinstituteCollege of Engineering
dc.contributor.schoolcollegeinstituteCollege of Engineering
dc.contributor.yokid328856
dc.contributor.yokid6033
dc.date.accessioned2024-11-10T00:05:26Z
dc.date.issued2013
dc.description.abstractThis study presents a constraint programming (CP) model for the quay crane scheduling problem (QCSP), which occurs at container terminals, with realistic constraints such as safety margins, travel times and precedence relations. Next, QCSP with time windows and integrated crane assignment and scheduling problem, are discussed. The performance of the CP model is compared with that of algorithms presented in QCSP literature. The results of the computational experiments indicate that the CP model is able to produce good results while reducing the computational time, and is a robust and flexible alternative for different types of crane scheduling problems.
dc.description.indexedbyWoS
dc.description.indexedbyScopus
dc.description.openaccessNO
dc.description.volume59
dc.identifier.doi10.1016/j.tre.2013.08.006
dc.identifier.issn1366-5545
dc.identifier.scopus2-s2.0-84885713891
dc.identifier.urihttp://dx.doi.org/10.1016/j.tre.2013.08.006
dc.identifier.urihttps://hdl.handle.net/20.500.14288/16446
dc.identifier.wos327231100007
dc.keywordsN/A
dc.languageEnglish
dc.publisherPergamon-Elsevier Science Ltd
dc.sourceTransportation Research Part E-Logistics And Transportation Review
dc.subjectEconomics
dc.subjectEngineering
dc.subjectCivil engineering
dc.subjectOperations research
dc.subjectManagement science
dc.subjectTransportation
dc.subjectTransportation science
dc.titleConstraint programming approach to quay crane scheduling problem
dc.typeJournal Article
dspace.entity.typePublication
local.contributor.authorid0000-0001-9524-3459
local.contributor.authorid0000-0003-0994-1758
local.contributor.kuauthorÜnsal, Özgür
local.contributor.kuauthorOğuz, Ceyda
relation.isOrgUnitOfPublicationd6d00f52-d22d-4653-99e7-863efcd47b4a
relation.isOrgUnitOfPublication.latestForDiscoveryd6d00f52-d22d-4653-99e7-863efcd47b4a

Files