Publication: Constraint programming approach to quay crane scheduling problem
dc.contributor.coauthor | N/A | |
dc.contributor.department | N/A | |
dc.contributor.department | Department of Industrial Engineering | |
dc.contributor.kuauthor | Ünsal, Özgür | |
dc.contributor.kuauthor | Oğuz, Ceyda | |
dc.contributor.kuprofile | PhD Student | |
dc.contributor.kuprofile | Faculty Member | |
dc.contributor.other | Department of Industrial Engineering | |
dc.contributor.schoolcollegeinstitute | Graduate School of Sciences and Engineering | |
dc.contributor.schoolcollegeinstitute | College of Engineering | |
dc.contributor.schoolcollegeinstitute | College of Engineering | |
dc.contributor.yokid | 328856 | |
dc.contributor.yokid | 6033 | |
dc.date.accessioned | 2024-11-10T00:05:26Z | |
dc.date.issued | 2013 | |
dc.description.abstract | This study presents a constraint programming (CP) model for the quay crane scheduling problem (QCSP), which occurs at container terminals, with realistic constraints such as safety margins, travel times and precedence relations. Next, QCSP with time windows and integrated crane assignment and scheduling problem, are discussed. The performance of the CP model is compared with that of algorithms presented in QCSP literature. The results of the computational experiments indicate that the CP model is able to produce good results while reducing the computational time, and is a robust and flexible alternative for different types of crane scheduling problems. | |
dc.description.indexedby | WoS | |
dc.description.indexedby | Scopus | |
dc.description.openaccess | NO | |
dc.description.volume | 59 | |
dc.identifier.doi | 10.1016/j.tre.2013.08.006 | |
dc.identifier.issn | 1366-5545 | |
dc.identifier.scopus | 2-s2.0-84885713891 | |
dc.identifier.uri | http://dx.doi.org/10.1016/j.tre.2013.08.006 | |
dc.identifier.uri | https://hdl.handle.net/20.500.14288/16446 | |
dc.identifier.wos | 327231100007 | |
dc.keywords | N/A | |
dc.language | English | |
dc.publisher | Pergamon-Elsevier Science Ltd | |
dc.source | Transportation Research Part E-Logistics And Transportation Review | |
dc.subject | Economics | |
dc.subject | Engineering | |
dc.subject | Civil engineering | |
dc.subject | Operations research | |
dc.subject | Management science | |
dc.subject | Transportation | |
dc.subject | Transportation science | |
dc.title | Constraint programming approach to quay crane scheduling problem | |
dc.type | Journal Article | |
dspace.entity.type | Publication | |
local.contributor.authorid | 0000-0001-9524-3459 | |
local.contributor.authorid | 0000-0003-0994-1758 | |
local.contributor.kuauthor | Ünsal, Özgür | |
local.contributor.kuauthor | Oğuz, Ceyda | |
relation.isOrgUnitOfPublication | d6d00f52-d22d-4653-99e7-863efcd47b4a | |
relation.isOrgUnitOfPublication.latestForDiscovery | d6d00f52-d22d-4653-99e7-863efcd47b4a |