Publication: Joint inventory and scheduling control in a repair facility
Loading...
Program
KU-Authors
Organization Authors
Co-Authors
van Houtum, Geert-Jan
Date
Language
Type
Embargo Status
N/A
Journal Title
Journal ISSN
Volume Title
Alternative Title
Abstract
We study inventory and repair scheduling decisions of a maintenance service provider for repairable capital goods. Because of high downtime costs, the service provider keeps spare parts on stock to replace broken parts quickly. The service provider should determine the inventory level of spare parts for each component and the repair scheduling policy. Furthermore, in case of a stock-out, the service provider should decide whether to back-order the demand or execute an emergency repair, which is an urgent but expensive repair operation for a broken part followed by a fast form of installation. The objective is to minimize the long-run average inventory holding, back-order, and emergency repair costs. We formulate the repairable network as a closed queueing system and consider an asymptotic regime in which the repair facility is in the conventional heavy-traffic regime. Then, we formulate and solve a Brownian control problem (BCP). From the optimal BCP solution, we derive a simple and intuitive decision rule stating if the emergency repairs are necessary to achieve a close-to-optimal system performance. Moreover, we propose a simple, intuitive, and easy-to-implement heuristic control policy and demonstrate its close-to-optimal performance via numerical experiments.
Source
Publisher
Informs
Citation
item.page.haspartof
Source
Operations Research
item.page.ispartofseries
item.page.edition
DOI
10.1287/opre.2023.2459
item.page.datauri
item.page.link
Rights
N/A
Copyrights Note
Rights and licensing
N/A
