Publication: Parallel machine scheduling with additional resources: notation, classification, models and solution methods
dc.contributor.coauthor | Edis, Emrah B. | |
dc.contributor.coauthor | Ozkarahan, Irem | |
dc.contributor.department | Department of Industrial Engineering | |
dc.contributor.kuauthor | Oğuz, Ceyda | |
dc.contributor.schoolcollegeinstitute | College of Engineering | |
dc.date.accessioned | 2024-11-09T23:13:31Z | |
dc.date.issued | 2013 | |
dc.description.abstract | Majority of parallel machine scheduling studies consider machine as the only resource. However, in most real-life manufacturing environments, jobs may require additional resources, such as automated guided vehicles, machine operators, tools, pallets, dies, and industrial robots, for their handling and processing. This paper presents a review and discussion of studies on the parallel machine scheduling problems with additional resources. Papers are surveyed in five main categories: machine environment, additional resource, objective functions, complexity results and solution methods, and other important issues. The strengths and weaknesses of the literature together with open areas for future studies are also emphasized. Finally, extensions of integer programming models for two main classes of related problems are given and conclusions are drawn based on computational studies. | |
dc.description.indexedby | WOS | |
dc.description.indexedby | Scopus | |
dc.description.issue | 3 | |
dc.description.openaccess | NO | |
dc.description.publisherscope | International | |
dc.description.sponsoredbyTubitakEu | N/A | |
dc.description.sponsorship | TUBITAK(Scientific and Technological Research Council of Turkey) [2218] Part of this study has been carried out when Emrah B. Edis was with Dokuz Eylul University and during his post-doctoral research at Koc University with the fellowship of TUBITAK(Scientific and Technological Research Council of Turkey) under Grant No: 2218. We also thank the anonymous referees for their helpful comments and suggestions. | |
dc.description.volume | 230 | |
dc.identifier.doi | 10.1016/j.ejor.2013.02.042 | |
dc.identifier.eissn | 1872-6860 | |
dc.identifier.issn | 0377-2217 | |
dc.identifier.quartile | Q1 | |
dc.identifier.scopus | 2-s2.0-84879501734 | |
dc.identifier.uri | https://doi.org/10.1016/j.ejor.2013.02.042 | |
dc.identifier.uri | https://hdl.handle.net/20.500.14288/9990 | |
dc.identifier.wos | 322055400001 | |
dc.keywords | Scheduling | |
dc.keywords | Parallel machines | |
dc.keywords | Additional resources | |
dc.keywords | Integer programming | |
dc.keywords | Dedicated machines | |
dc.keywords | Secondary resource | |
dc.keywords | Algorithms | |
dc.keywords | Time | |
dc.keywords | Subject | |
dc.keywords | Tasks | |
dc.keywords | Constraints | |
dc.keywords | Processors | |
dc.keywords | Heuristics | |
dc.keywords | Minimize | |
dc.language.iso | eng | |
dc.publisher | Elsevier | |
dc.relation.ispartof | European Journal of Operational Research | |
dc.subject | Management | |
dc.subject | Operations research | |
dc.subject | Management science | |
dc.title | Parallel machine scheduling with additional resources: notation, classification, models and solution methods | |
dc.type | Review | |
dspace.entity.type | Publication | |
local.contributor.kuauthor | Oğuz, Ceyda | |
local.publication.orgunit1 | College of Engineering | |
local.publication.orgunit2 | Department of Industrial Engineering | |
relation.isOrgUnitOfPublication | d6d00f52-d22d-4653-99e7-863efcd47b4a | |
relation.isOrgUnitOfPublication.latestForDiscovery | d6d00f52-d22d-4653-99e7-863efcd47b4a | |
relation.isParentOrgUnitOfPublication | 8e756b23-2d4a-4ce8-b1b3-62c794a8c164 | |
relation.isParentOrgUnitOfPublication.latestForDiscovery | 8e756b23-2d4a-4ce8-b1b3-62c794a8c164 |