Publication:
Joint inventory and scheduling control in a repair facility

dc.contributor.coauthorvan Houtum, Geert-Jan
dc.contributor.departmentDepartment of Business Administration
dc.contributor.kuauthorÖzkan, Erhun
dc.contributor.schoolcollegeinstituteCollege of Administrative Sciences and Economics
dc.date.accessioned2025-01-19T10:33:30Z
dc.date.issued2023
dc.description.abstractWe study inventory and repair scheduling decisions of a maintenance service provider for repairable capital goods. Because of high downtime costs, the service provider keeps spare parts on stock to replace broken parts quickly. The service provider should determine the inventory level of spare parts for each component and the repair scheduling policy. Furthermore, in case of a stock-out, the service provider should decide whether to back-order the demand or execute an emergency repair, which is an urgent but expensive repair operation for a broken part followed by a fast form of installation. The objective is to minimize the long-run average inventory holding, back-order, and emergency repair costs. We formulate the repairable network as a closed queueing system and consider an asymptotic regime in which the repair facility is in the conventional heavy-traffic regime. Then, we formulate and solve a Brownian control problem (BCP). From the optimal BCP solution, we derive a simple and intuitive decision rule stating if the emergency repairs are necessary to achieve a close-to-optimal system performance. Moreover, we propose a simple, intuitive, and easy-to-implement heuristic control policy and demonstrate its close-to-optimal performance via numerical experiments.
dc.description.indexedbyWOS
dc.description.indexedbyScopus
dc.description.issue5
dc.description.openaccessGreen Published, Green Submitted
dc.description.publisherscopeInternational
dc.description.sponsoredbyTubitakEuN/A
dc.description.volume71
dc.identifier.doi10.1287/opre.2023.2459
dc.identifier.issn0030-364X
dc.identifier.quartileQ2
dc.identifier.scopus2-s2.0-85174039402
dc.identifier.urihttps://doi.org/10.1287/opre.2023.2459
dc.identifier.urihttps://hdl.handle.net/20.500.14288/26615
dc.identifier.wos989255000001
dc.keywordsSpare parts
dc.keywordsInventory control
dc.keywordsScheduling
dc.keywordsAsymptotic analysis
dc.language.isoeng
dc.publisherInforms
dc.relation.ispartofOperations Research
dc.subjectManagement
dc.subjectOperations research
dc.subjectManagement science
dc.titleJoint inventory and scheduling control in a repair facility
dc.typeJournal Article
dspace.entity.typePublication
local.contributor.kuauthorÖzkan, Erhun
local.publication.orgunit1College of Administrative Sciences and Economics
local.publication.orgunit2Department of Business Administration
relation.isOrgUnitOfPublicationca286af4-45fd-463c-a264-5b47d5caf520
relation.isOrgUnitOfPublication.latestForDiscoveryca286af4-45fd-463c-a264-5b47d5caf520
relation.isParentOrgUnitOfPublication972aa199-81e2-499f-908e-6fa3deca434a
relation.isParentOrgUnitOfPublication.latestForDiscovery972aa199-81e2-499f-908e-6fa3deca434a

Files